Categories
Civil Engineering

design a short axially loaded square column 500×500mm for a service load of 2000

design a short axially loaded square column 500×500mm for a service load of 2000KN. Use M20 and Fe415(LSM) P=20000

Categories
Civil Engineering

A sample Matlab code used to solve this problem is attached for reference. You m

A sample Matlab code used to solve this problem is attached for reference. You may modify and adjust the code to solve this problem problem 10.1 (a,b,c) shown in the attachment

Categories
Civil Engineering

Based upon the information provided you will be required to prepare a constructi

Based upon the information provided you will be required to prepare a construction estimate and schedule for plans provided. Class:
Here is an outline of how the project should be presented:
Outline of the Deliverables
Title Sheet
Table of Contents
Introduction of the project (2-3 Paragraphs)
A written summary (use complete sentences) of the Schedule which should include the following as a minimum:Start Date
Finish Date
Duration
Critical Path
Float
Your Approach
How the different production rates are managed efficiently
How the difficulties affected the schedule
A written summary (use complete sentences) of the Construction Cost Estimate which should include the following as a minimum:The overall cost
The percentage of the overall budget for each item,
A written summary of the how the used TBM will affect the schedule and the project budget.
Provide recommendations to speed up the schedule. Apply what you have during the course and preparing this project. Use your imagination and be creative.
AppendixSchedule
Cost Estimate Financial Analysis of used TBM

Categories
Civil Engineering

Ssc je civil engineering all formula numerical.Ssc je civil engineering all form

Ssc je civil engineering all formula numerical.Ssc je civil engineering all formula numerical. all civil engineering formula note.

Categories
Civil Engineering

Hello, First of all I will give you more information on the project itself. I wi

Hello,
First of all I will give you more information on the project itself. I will include the RFP for our project below which shows a vicinity map along with more information. The RFP is attached below. This is labeled as “RFP-SDSU MV BIKEPATH.PDF”
Second of all I will attach two examples of a hydrology report and geotechnical report that is for a bike path, other than the introduction and purpose I will just need you to complete the calculations and the findings for the reports. Those two examples are provided below. These are labeled as “FINAL GEOTECH REPORT.PDF” and “HYDROLOGY REPORT.PDF ” These are only examples of what it should be similar to. The introduction and purpose is not necessary only finding and calculations along with an explanation of the calculations. The coordinates of our bike path that we will need the soil types and calculations for around this area will be shown below:
Beginning of path 32.77929° N, 117.07834° W
Bridge crossing over highway 32.78000° N, 117.09611° W
Near the end of path 32.78140° N, 117.11646° W
You can use this website or any of the resource websites that are provided in the RFP that is shown below to get the soil type.
https://websoilsurvey.sc.egov.usda.gov/App/WebSoilSurvey.aspx
The footing of our bridge will most likely be a rectangular shape or square. If you need any more information please call or email but if you email send a message on whats app that you sent an email to me to make sure I check it as soon as possible. We are from San Diego, California. Please make sure if you reference any manuals or codes that you reference stuff that are specifically for san diego california. The codes and manuals that might be useful are provided in the RFP and the examples I provided.

Categories
Civil Engineering

Question 1. Discuss the primary goal in steel production. Describe metallic bon

Question 1.
Discuss the primary goal in steel production. Describe metallic bonds, why they result in well-
ordered crystals, why metallic bonds can be conductive, and three different types of defects that
can occur in crystal structures.
Question 2.
Using the following phase diagram to answer this question:
a. At what temperature will 30% (by weight) combination of aluminum and lithium be in
a fully liquid phase?
b. What range of lithium weight percent will result in the Al2Li3 phase at 200C
Question 3.
Describe the pros and cons of using epoxy coated rebar.
Question 4.
Discuss corrosion in concrete including its causes and different ways to delay it.
Question 5.
Explain what makes steel a good candidate for use in concrete reinforcement.
Question 6
Explain why concrete cracks when steel reinforcement corrodes. Why does carbonation of the
concrete cause steel reinforcement to corrode?

Categories
Civil Engineering

Question 1. Discuss the primary goal in steel production. Describe metallic bon

Question 1. Discuss the primary goal in steel production. Describe metallic bonds, why they result in well-
ordered crystals, why metallic bonds can be conductive, and three different types of defects that can occur in crystal structures. Question 2. Using the following phase diagram to answer this question:
a. At what temperature will 30% (by weight) combination of aluminum and lithium be in a fully liquid phase?
b. What range of lithium weight percent will result in the Al2Li3 phase at 200C
Question 3. Describe the pros and cons of using epoxy coated rebar. Question 4. Discuss corrosion in concrete including its causes and different ways to delay it.
Question 5. Explain what makes steel a good candidate for use in concrete reinforcement.
Question 6
Explain why concrete cracks when steel reinforcement corrodes. Why does carbonation of the concrete cause steel reinforcement to corrode?

Categories
Civil Engineering

Looking for someone skill to draw this Architectural layout to draw in Autocad,

Looking for someone skill to draw this Architectural layout to draw in Autocad,
Structural drawing with all elements.
I attached a sample of what needed.

Categories
Civil Engineering

The page requirement is 3-5 pages. you should spend between 1.5 and 2.5 pages on

The page requirement is 3-5 pages. you should spend between 1.5 and 2.5 pages on both sections (reflection and analysis), for a total of 3-5 pages.

Categories
Civil Engineering

I uploaded project you have to do a construction take off, estimate, and schedul

I uploaded project you have to do a construction take off, estimate, and schedule using the drawings I gave you please you can do excel or draw it out